• Commit to replacing your unacceptable (b)(4) equipment with equipment composed of materials that are suitable for their intended use.
• Provide a risk assessment for any drugs within their re-test date manufactured using inappropriate equipment and distributed within the United States. Determine whether any of your equipment surfaces are reactive, absorptive, or additive so that drug quality, purity, or safety may be affected.
• A data-driven and scientifically sound process validation program that identifies all sources of variability, establishes robust design and controls, and ensures oversight of intra-batch and inter-batch variation on an ongoing basis throughout the product lifecycle. Also, include your process qualification protocol and results from your recent validation study.
• The results from your stability study of validation batches.
• A comprehensive, independent evaluation and remediation of your change management system. The evaluation should include, but not be limited to, assuring changes are appropriately justified, approved by your quality unit, and evaluated for effectiveness. Also, include a retrospective assessment of all changes executed outside an appropriate change management process since September 1, 2015, and the effect on product quality.
• A comprehensive, independent evaluation and remediation of your CAPA system. The evaluation should include but not be limited to a retrospective analysis of the effectiveness of all CAPAs since September 1, 2015.
• An assessment of drug quality risk and toxicity of the (b)(4) impurity. Also, provide an updated investigation into the impurity, including the specification established for it and verification that your process improvements (including automation) have been effective.