• A retrospective, independent review of all invalidated OOS (in-process and finished testing) results obtained for products on the U.S. market. Assess whether the scientific justification and evidence was conclusive. For investigations that conclusively establish laboratory root cause, determine adequacy of the CAPA, and ensure that other laboratory methods vulnerable to the same root cause are identified for remediation. For any OOS results with inconclusive or no root cause identified in the laboratory, include a thorough review of production (e.g., batch manufacturing records, adequacy of the manufacturing steps, raw materials, process capability, deviation history, batch failure history).
• Provide a summary report of the retrospective review of all OOS investigations for product that remain within expiry. Include a CAPA plan that identifies manufacturing root causes and specifies meaningful improvements. Include the product name, date of the original result, initial and retest OOS results, detailed rationale for invalidating the OOS result, and the outcome of your thorough reassessment. Also, include any additional market actions you intend to initiate because of the retrospective review.
• A fully remediated OOS investigation procedure, including but not limited to modifications to ensure investigations expand to manufacturing operations when a root cause is not conclusively identified in the laboratory.
• Updated investigation into the root cause of container-closure system failures leading to increased (b)(4).
• Testing of retain samples of batches of all drug products within expiry in the U.S. market that used the (b)(4) suppliers (i.e., raw materials, fabricators) associated with excessive (b)(4).
• A comprehensive, independent assessment of the quality of all (b)(4) container-closure raw materials (parts such as (b)(4), etc.) and adequacy of all sites who perform (b)(4) fabrication processes. This thorough assessment should also include an evaluation of the adequacy of your qualification program for suppliers of container-closure raw materials ((b)(4) part suppliers) and manufacturers of both (b)(4) and (b)(4).
• A full description of your (b)(4) material sourcing process and (b)(4) manufacturing process for both (b)(4) and (b)(4). Include the roles and responsibilities of all parties involved in the (b)(4) supply chain and production. Specifically, for all lot of (b)(4) produced since July 1, 2015, provide a detailed summary of all suppliers and manufacturers that you used for your (b)(4) materials, and vendor lot numbers. In each case describe who performed the (b)(4) formation, fabrication, and final assembly (including the specific nature of any in-house operations, such as use of (b)(4) operations). Include any subcontractors or other parties involved with material supply or fabrication.
• Vendor-generated Certificates of Analysis (COA) for (b)(4) part manufacturers and suppliers, as well as (b)(4) fabricators and assemblers.
• An assessment of your overall system for investigations into deviations, discrepancies, complaints, OOS results, and failures. Your CAPA plan should include, but not be limited to, improved rigor in reviewing the sources of variation in your operation that may cause deviations, failures, or defects, as well as an extensive remediation of your capabilities to ensure CAPA effectiveness.
• A comprehensive, independent risk assessment of production records including but not limited to your visual inspection documentation to determine the completeness, consistency, and accuracy of reported data. Indicate how you determined that the data you used to release product was attributable, legible, contemporaneously recorded, original or a true copy, and accurate. Include a re-examination of retain samples.
• Provide a complete assessment of documentation systems used throughout your manufacturing and laboratory operations to determine where documentation practices are insufficient. Include a detailed CAPA plan that comprehensively remediates documentation practices, and ensures you retain complete, contemporaneously prepared, and accurate records.
• A comprehensive, independent review of your preventive maintenance program(s) for both facilities and equipment, and a CAPA plan to ensure its effectiveness. Your plan should include but not be limited to contingencies for expected seasonal fluctuations in rainfall.
• A CAPA plan that formalizes routine, vigilant production management oversight of facility conditions to assure prompt detection of issues, execution of repairs, and other appropriate actions.
• Your plan to monitor and control humidity levels in the facility to prevent major environmental control issues due to fungi and other microbial contaminants, which were associated with past product recalls by your firm. Also, explain how your will ensure prompt detection of fungi in the facility.
• Your plan to requalify the facility after remediating the water damage, including your environmental qualification strategy.